Certificate 0177851
Quality Management System issued by Intertek and valid until 09 June 2027. Scope: Design and Fabrication of Steel Structures, Plate Works and Pressure Vessels.
Download certificate PDFQuality, HSE & ISO
QA/QC is not a standalone service at Astron. It is embedded across EPC, engineering, procurement support, construction, project management, fabrication, site installation and handover.
Built-in controlsCurrent certificates
Astron publishes current certificate evidence and avoids unsupported certificate, stamp or execution-class claims.
Quality Management System issued by Intertek and valid until 09 June 2027. Scope: Design and Fabrication of Steel Structures, Plate Works and Pressure Vessels.
Download certificate PDFOccupational Health & Safety Management System issued by Intertek and valid until 09 June 2027. Scope: Design and Fabrication of Steel Structures, Plate Works and Pressure Vessels.
Download certificate PDFAdditional certifications, code stamps, client logos or archive project photos are not published without current formal evidence and management approval.
Document centerCertificate evidence
Downloadable PDF copies are available below for prequalification and client review.
Certificate 0177851
Quality Management System · Intertek · Valid until 09 June 2027.
Download PDFCertificate 0177939
Occupational Health & Safety Management System · Intertek · Valid until 09 June 2027.
Download PDFOperational quality
Astron’s quality approach is wider than welding. It covers engineering review, procurement support, construction planning, materials, site execution, fabrication, installation, inspection, HSE and handover records.
Drawing review, constructability checks, revision control and controlled release of technical information.
Technical submittals, material receiving, MTC review, identification and traceability logs.
Inspection and test plans, work inspection requests, method statements, site records and punch tracking.
Project HSE planning, site risk controls, toolbox coordination, work permits and safety records according to project requirements.
Fit-up, dimensional checks, welding controls, NDT coordination, coating inspection and release documentation.
Inspection reports, NCR/CAPA records, calibration status, as-built records and manufacturing data books.
Inspection detail
Industrial material controlAstron principle
Every Astron scope is expected to carry the required quality, safety, inspection and documentation controls. These systems support EPC, construction, project management and fabrication delivery as one operating culture.
Prequalification support
Our commercial team can support prequalification requirements with controlled documentation and current certificates.